Four‐lane carriage way, 3.6 km long, with underpasses and two Bridges.
One four lane bridge part of which passes over a Wadi, with height up to 20m

Excavation: 235000 m3
Fill: 480000 m3
Reinforced concrete: 20000 m3
Asphalt works: 250000 m2