Four‐lane carriageway, 8.0 km long with two bridges.
One of the constructed as a Pre‐stressed concrete, and the other as Box Girder
One of the bridges is a four‐lane bridge, length 91m, Height 13m, part on a spiral curve and part on a circular curve.

Cut: 600,000 m3
Sewer line: 3,000 Lm
Fill: 400,000 m3
Reinforced concrete: 20,000 m3
Drainage: 9,000 Lm
Asphalt works: 245,000 m2